Facilitating the supply and installation of a new 3-level elevator and the construction of a mezzanine floor, this project highlights our commitment to quality and excellence.
Our scope of work included constructing the mezzanine floor using high-grade, safe structural steel to ensure durability and safety, with access provided via a robust steel staircase. Throughout the project, we adhered to all elevator company requirements and inspections, ensuring compliance with superior standards.
Our team used robust blockwork and reinforced concrete to construct the mezzanine floor, providing a solid foundation and structure. Despite the complexity of the project, we completed it within budget while maintaining the highest quality of workmanship.
Verizon Contracting LTD.